Paperback
Uncover hidden project delays before time runs out in Dubai

The Critical Path

A Business Novel About Schedules, Claims and Telling the Truth

$52.80
  • Paperback

    192 pages

  • Release Date

    21 October 2026

Check Delivery Options

Summary

Six months late. Fourteen days reported. Eighty-four days to tell the truth.

Nadia Farouk is a senior planner who can make any schedule behave. When her company sends her to Dubai to “tidy the programme” on a troubled 600-bed hospital, she expects a few weeks of formatting. Instead she finds forty-seven date constraints hiding a six-month delay, a project director determined to keep his number, a client moving toward termination, and a contract clock counting down to the day her company’s right to claim expires.

To save the project, Nadia must answer three questions that an old forensic delay expert writes on a napkin:

Whose delay is it? When did you know? Can you prove it?

And she must decide what to do when some of the answers belong to her own company.

A business novel and a complete project controls course in one book. Written by a practitioner with more than twenty years in planning, scheduling, delay analysis and construction claims, The Critical Path teaches the way the job is really learned: under pressure, on a real project, with real people. Along the way you will learn:

  • The critical path method (CPM), total float, free float and the longest path
  • Why mandatory constraints hide delay instead of removing it
  • How to read a schedule health check, including the DCMA 14-point assessment
  • Baselines, progress measurement, earned value management (EVM) and earned schedule
  • Windows analysis, time impact analysis (TIA) and concurrent delay
  • Notices, time bars and extension of time (EOT) claims under an international standard contract (FIDIC 2017)
  • Resource levelling, recovery planning, and testing and commissioning
  • How to write a one-page report that a board will actually read

Every chapter ends with a page from the mentor’s notebook, a short summary of what the chapter teaches. The book closes with a 47-term glossary, a lessons-by-chapter index and three ready-to-use tools: a one-page summary template, an Engineer’s programme-review checklist and a list of lessons learned.

For planners and schedulers, project managers, construction managers, engineers, quantity surveyors, contract and commercial managers, and students of construction and project management. And for anyone who has ever been asked to hold the dates.

Book Details

ISBN-13:9781997355267
ISBN-10:1997355264
Author:Hassan Khames Eliwa
Publisher:Eliwa Project Controls Limited
Imprint:Eliwa Project Controls Limited
Format:Paperback
Number of Pages:192
Release Date:21 October 2026
Weight:240g
Dimensions:12mm x 152mm x 229mm
A-Format
B-Format
The Critical Path by Hassan Khames Eliwa - ISBN: 9781997355267
152 × 229 mm
C-Format
A4
mm / in
About The Author

Hassan Khames Eliwa

Dr. Hassan Khames Eliwa is a Project Controls and Planning professional with more than 17 years of experience across infrastructure, building and engineering projects in New Zealand and internationally.

He holds a PhD in Construction Management and has published multiple academic and industry papers in project management, project controls and construction technology. Throughout his career, Dr. Eliwa has specialized in planning, scheduling, delay analysis, project controls, earned value management and executive reporting using industry-leading platforms such as Primavera P6, Microsoft Project and Synchro 4D.

He is the founder of a knowledge-sharing platform dedicated to practical project controls education, and Director of Eliwa Project Controls Limited, New Zealand. His mission is simple: To make professional project controls knowledge accessible, practical and immediately useful for project teams worldwide.

Returns

This item is eligible for free returns within 30 days of delivery. See our returns policy for further details.