Truth, Lies and O-Rings, 9780813041933
Paperback
Originally published in hardcover in 2009.

Truth, Lies and O-Rings

Inside the Space Shuttle `Challenger' Disaster

$75.29

  • Paperback

    626 pages

  • Release Date

    29 March 2012

Check Delivery Options

Summary

What they didn’t want you to know

“We all watched in shock and disbelief when “Challenger “was lost. Probably no one felt more disappointment and regret than Allan McDonald, who had warned us not to launch that day. His story tells of loss, grief, and the eventual rebuilding and recovery.“—Robert “Hoot” Gibson, former Space Shuttle pilot and commander

“A major contribution to a difficult episode in the history of human spaceflight.“—Roger D. Launius, Division of Space History,…

Book Details

ISBN-13:9780813041933
ISBN-10:0813041937
Author:Allan J. McDonald
Publisher:University Press of Florida
Imprint:University Press of Florida
Format:Paperback
Number of Pages:626
Release Date:29 March 2012
Weight:935g
Dimensions:233mm x 154mm x 33mm
What They're Saying

Critics Review

We all watched in shock and disbelief when Challenger was lost. Probably no one felt more disappointment and regret than Allan McDonald, who had warned us not to launch that day. His story tells of loss, grief, and the eventual rebuilding and recovery.“”–Robert ““Hoot”” Gibson, former Space Shuttle pilot and commander ““A major contribution to a difficult episode in the history of human spaceflight.”“–Roger D. Launius, Division of Space History, Smithsonian Institution ““McDonald tells the heartbreaking tale of how he saw his words of warning ignored, and the fateful consequences of that decision.”“–Donald C. Elder III, Eastern New Mexico University

About The Author

Allan J. McDonald

Allan J. McDonald retired as vice president and technical director for advanced technology programs at ATK Thiokol Propulsion in 2001. He was the director of the Space Shuttle Solid Rocket Motor Project at the time of the Challenger accident and, later, vice president of engineering for space operations during the redesign and requalification of the solid rocket motors.

Returns

This item is eligible for free returns within 30 days of delivery. See our returns policy for further details.